![IMG_1451.jpeg](https://static.wixstatic.com/media/bc4c19_d53a38ab821645cd9be2195235ef8c66~mv2.jpeg/v1/fill/w_980,h_735,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/bc4c19_d53a38ab821645cd9be2195235ef8c66~mv2.jpeg)
FACILITY
IN LESMIERZ
The company and the plant is located in the Lesmierz village in the administrative district of Ozorkow, Lodz Voivodeship, in central Poland.
90 min. by car from the Warsaw Airport
30 km from Lodz - the third largest city in Poland
15 min by car to the A1/A2 highway junction
300 km to the Port of Gdansk
What does the Ekotrend biofuels plant include?
![Biofuels production plant at Ekotrend Biofuels Reserach Facility in Lesmierz](https://static.wixstatic.com/media/bc4c19_9ba59ff189ae4059b0f3e1f818abeaf3~mv2.jpg/v1/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_7335%20(1)_edited_edited.jpg)
1. Production plant
Full scale biofuel plant
![Biofuels additives dosing skid at Biofuels Research Facility in Lesmierz](https://static.wixstatic.com/media/bc4c19_a5265b4f036a4968b8c0c22d68c37d49~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_1507.jpeg)
5. Additives dosing skid
Additives injection system
![Biofuels farm at Ekotrend Facility in Lesmierz](https://static.wixstatic.com/media/bc4c19_0f5203f83647416da506e3dae7363d1f~mv2.jpeg/v1/crop/x_512,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_0703.jpeg)
2. Fuel farm
four biofuel tanks including two certified for customs purposes
![Warehouse at Ekotrend Biofuels Research Facility in Lesmierz](https://static.wixstatic.com/media/bc4c19_ec3efc224fde489db7a227d5f50a2216~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_7337.jpeg)
6. Warehouse
1000 m² warehouse of raw materials, waste and spare parts
![Pump astation at Biofuels Research Facility in Lesmierz](https://static.wixstatic.com/media/bc4c19_2f956135e558463b9f81d3d6b80b7018~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_1472.jpeg)
3. Pump station
Certified fuel loading rack, flow meters and pumps.
![Parking lot at Ekotrend in Lesmierz](https://static.wixstatic.com/media/bc4c19_6e8f388f665f48aab1f3f78bd2ccaee3~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_1506.jpeg)
7. Parking lot & security cabin
![Fuel finishing section at Ekotrend Biofuels Research Facility](https://static.wixstatic.com/media/bc4c19_a49a800da1ca45c7bcf6258281866803~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_0699%20(1).jpeg)
4. Fuel finishing
Fuel and water filtration
![Truck scale - Biofuels Reserach Facility in Lesmierz](https://static.wixstatic.com/media/bc4c19_87c050bf93bd4d96a07b8124260a6656~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_1523.jpeg)
8. Truck scale
![Ekotrend Office in Lesmierz](https://static.wixstatic.com/media/bc4c19_db49df4b30ce4ce99b311c5c51c38b8c~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_0755.jpeg)
9. Office
Reception, 3 offices and conference room
![Social space for employees in Biofuels Research Facility in Lesmierz.](https://static.wixstatic.com/media/bc4c19_a12e127cdd714ac1be36178526f5c6c3~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_0696.jpeg)
10. Social space
Break room and locker rooms for 18 employees
![Reseach Ekotrend Laboratory](https://static.wixstatic.com/media/bc4c19_17bbb5b9cfed41c7ad16330aab52183a~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_0216.jpeg)
11. Laboratory
![Fire protection system at Ekotrend Biofuels Research Facility in Lesmierz](https://static.wixstatic.com/media/bc4c19_f7dde71ef3224772b39e0217387b81a4~mv2.jpeg/v1/crop/x_0,y_256,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_0225.jpeg)
12. FP
Fire protection system with 200 m³ water tank, suppression system and power generator
![Substation at Ekotrend Biofuels Research Facility in Lesmierz](https://static.wixstatic.com/media/bc4c19_4aceb41380904f35b82366e5e9d96972~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_1505.jpeg)
13. Substation
700 kW transformer station, switchgear and 500 kW power generator
![Fan coolers - the section of production line at Ekotrend Biofuels Research Facility.](https://static.wixstatic.com/media/bc4c19_845e569589474960a6e7392739350e44~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_1494.jpeg)
14. Fan coolers
Glycol fan coolers - the module of biofuel plant
![Workshop at Ekotrend in Lesmierz.](https://static.wixstatic.com/media/bc4c19_10321522c2624a038e4b2f528f9c3ac1~mv2.jpeg/v1/crop/x_256,y_0,w_1536,h_1536/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/IMG_0087.jpeg)
15. Workshop
Well-equipped workshop which was rebuilt in 2022
![Control Room which allows to run the process of catalytic depolymerization of biomass at Ekotrend Biofuels Research Facility.](https://static.wixstatic.com/media/bc4c19_e2646932a50748e786260530877b5b24~mv2.jpg/v1/crop/x_674,y_0,w_2693,h_2693/fill/w_168,h_168,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/4.jpg)
16. Control room
Control room allowing the installation to be operated by 3 employees